Boiler House Solutions
Boiler house solutions, Singapore
Everything in the boiler house.One accountable partner.
Steam generation, distribution, safety, flow measurement and efficiency monitoring — sized, supplied, installed and supported by Techmatic Controls.

A boiler is only as good as the system around it
Steam that leaves the boiler still has to be reduced to the right pressure, protected against overpressure, measured and accounted for. We supply every item on this drawing, and we size them together — so the pieces work as a system rather than a parts list.
| No. | Equipment | Brand | Role in the boiler house |
|---|---|---|---|
| 1 | Steam boiler | CERTUSS | Raises steam at the required pressure, matched to the plant's load profile. |
| 2 | Pressure reducing valve | Miyawaki | Delivers steam to each user at the pressure the process needs. |
| 3 | Safety valves | Goetze | Protect the boiler and reduced-pressure mains against overpressure. |
| 4 | Boiler gauge glass | Apollo | Direct visual confirmation of boiler water level. |
| 5 | Automatic blowdown valve | ADCA | Removes dissolved solids and sludge from the boiler; operation logged by the monitoring system. |
| 6 | Flowmeters | Tekflow | TekVorx on steam, TekMag on water, TekMass on fuel gas. |
| 7 | Efficiency monitoring | Boiler Efficiency Monitoring System | Turns the meter data into live efficiency, fuel cost and Scope 1 emissions. |
CERTUSS steam boilers: full steam in minutes, not hours
CERTUSS steam boilers reach full output within minutes of a cold start. For a plant that runs one shift, or in batches, that means no large water volume held hot overnight waiting for the next run — and none of the standing losses that go with it.
- Fast start — full steam in roughly three to five minutes from cold, depending on range.
- Compact, vertical construction — small footprint for the output; suitable for mezzanine installation.
- Modulating burners on the Universal TC (50–100%) and UMX (20–100%) track the load instead of cycling.
- Fired or electric — natural gas, LPG, light fuel oil, bio-fuel and dual fuel; or electric where there is no flue route.
- Plant integration — touch-screen control with remote monitoring; Modbus, BACnet, Profibus and CAN bus on the Universal TC.
- Scalable — multiple units can run together where demand exceeds a single unit.
Sizing and site survey
Steam boilers are not sold from a catalogue. The right size depends on your actual steam load — not the rating of the boiler being replaced.
To size the unit we need
- Steam demand — peak, average and variation across shift or batch
- Required steam pressure at point of use
- Fuel available on site and operating pattern
- Feedwater supply and whether condensate is returned
How we supply it
Boilers are supplied as turnkey projects — sizing, supply, installation, commissioning, in-service optimisation and MOM approvals — with servicing, upgrades and maintenance afterwards.
The site survey covers
- Space, access route and floor or mezzanine loading
- Flue route and termination
- Fuel supply, gas train and electrical supply
- Water treatment, feedwater and blowdown
- Steam distribution to the point of use
Getting steam to the process — safely
These are the items that decide whether the steam a boiler makes actually reaches the process at the right pressure, dry, and without waste. We select them against the conditions on your line, not a catalogue default.
2Miyawaki pressure reducing valves
Most processes need steam well below boiler pressure. A correctly sized PRV holds downstream pressure steady as the load changes; an oversized one hunts and wears its seat.
- Direct-acting and pilot-operated types
- Sized on inlet pressure, set pressure and actual flow — not pipe size
- Matching strainer, separator and downstream safety valve available
3Goetze safety valves
The last line of protection on the boiler and on every reduced-pressure main downstream of a PRV.
- Boiler safety valves sized to relieve full boiler output at set pressure
- Downstream safety valves sized for PRV failure-open flow
- Set pressure, materials and test documentation specified for MOM registration and Authorised Examiner examination
4Apollo boiler gauge glasses
A direct, visual check of boiler water level that does not depend on electronics — the reference operators verify level controls against.
- Reflex and transparent gauge types
- Rated for boiler pressure and temperature
- Complete with isolation and drain cocks for blowdown testing; replacement glasses and gaskets
5ADCA automatic blowdown valves
Blowdown keeps dissolved solids and sludge in the boiler within limits. Done by hand, it is either missed or overdone — and every overdone blowdown sends heated water to drain.
- Rated for boiler pressure and temperature
- Linked to the Boiler Efficiency Monitoring System, so each blowdown is logged and excess blowdown is flagged
Why buy the distribution items and boiler fittings from the boiler supplier
The PRV, its downstream safety valve and the boiler fittings are sized from the same numbers as the boiler: pressure, peak flow and load profile. Buying them together means one set of calculations and one party accountable if the system does not perform.
You cannot manage what you do not meter
Boiler efficiency is fuel in against steam out. Without a meter on each, efficiency is an estimate made once a year. Three Tekflow meters cover the three streams that matter in a boiler house.
TekVorx vortex
Vortex-shedding principle with no moving parts — suited to saturated and superheated steam.
- Boiler outlet main
- Branch headers to each department or user
- Specify with temperature / pressure compensation for mass flow
TekMag electromagnetic
Full-bore, no pressure drop, no moving parts — for conductive liquids.
- Make-up water to the feedwater tank
- Cooling water and process water
- Not for low-conductivity condensate or demineralised water — we will recommend an alternative
TekMass thermal mass
Measures gas mass flow directly, without separate pressure and temperature compensation.
- Natural gas to the burner
- Compressed air and other process gases
- The fuel-in half of the efficiency calculation
What the meters tell you
| Measurement point | Meter | What it gives you |
|---|---|---|
| Fuel gas to burner | TekMass | Fuel consumption and cost; Scope 1 emissions from fuel flow |
| Steam leaving the boiler | TekVorx | Steam production; fuel-to-steam ratio and direct-method efficiency |
| Steam to each user | TekVorx | Allocation of steam cost by department, line or product |
| Make-up water | TekMag | Condensate recovery rate — high make-up points to lost condensate or leaks |
Sized and specified by Techmatic
A flowmeter chosen on line size alone often ends up running at the bottom of its range. We size each meter on the actual minimum, normal and maximum flow, and supply the certificates and configuration to match. Other Tekflow technologies — ultrasonic, turbine and variable-area — are available where the application calls for them. Tekflow range
Boiler Efficiency Monitoring System
One integrated system — sensors, edge gateway and cloud dashboard — giving plant, finance and sustainability teams the same live view of combustion efficiency, fuel cost and Scope 1 emissions. Retrofits to any boiler brand, fire-tube or water-tube, gas, diesel or biomass.
What it measures
- Fuel & steam flow
- Fuel in, steam out, feedwater
- Flue gas
- Stack O₂, CO and temperature
- Thermal profile
- Feedwater temperature, deaerator pressure
- Auxiliaries
- Boiler feed pump kW
- Blowdown
- Blowdown valve operation and frequency
What it calculates
- Efficiency
- Thermal and combustion efficiency, continuously
- EnPIs
- Fuel-to-steam ratio, condensate recovery rate
- Cost
- Fuel cost per tonne of steam
- Carbon
- Scope 1 emissions from fuel flow
Alerts for burner drift, blowdown spikes and efficiency loss — before they show up on the fuel bill.
Open integration with existing BMS and SCADA.
Audit-ready data structured for ISO 50001-aligned energy management and energy audit reporting.
More on the Boiler Efficiency Monitoring System
An in-house Singapore Certified Energy Manager
We audit the boiler house, rank the savings and build the equipment case — supporting plants on the path to Singapore's net-zero by 2050.
Supply is the start, not the end
| Service | What it covers |
|---|---|
| Turnkey boiler projects | Sizing, supply, installation, pipework, commissioning, in-service optimisation and MOM approvals |
| Boiler servicing and upgrades | Scheduled servicing, burner and control upgrades, economiser retrofits |
| Steam system analysis | Whole-system review of generation, distribution and condensate return |
A partner, not just a vendor
Engineering, not just supply
Every item is selected and sized against your actual line conditions.
35 years, second-generation owners
Serving Singapore's process industry since 1989.
In-house energy capability
Processes in line with recognised standards such as ISO 50001.
One accountable party
One set of calculations from boiler to steam header.
Common questions
How quickly does a CERTUSS steam boiler reach full steam?
Roughly three to five minutes from a cold start, depending on the range. That suits plants that run one shift or in batches, because no large volume of water has to be held hot overnight.
What information do you need to size a steam boiler?
Your steam demand (peak, average and variation across a shift or batch), the steam pressure required at point of use, the fuel available on site and your operating pattern, and your feedwater supply and whether condensate is returned. We confirm the rest during the site survey.
Do you handle MOM approvals?
Yes. Turnkey boiler projects include MOM approvals, and Goetze safety valves are supplied with the set pressure, materials and test documentation specified for MOM registration and Authorised Examiner examination.
Is there an option if our site has no flue route?
Yes. CERTUSS boilers are available as electric units, alongside natural gas, LPG, light fuel oil, bio-fuel and dual-fuel models.
Can the Boiler Efficiency Monitoring System be fitted to our existing boiler?
Yes. It retrofits to any boiler brand — fire-tube or water-tube, gas, diesel or biomass — and integrates with existing BMS and SCADA.
Why buy the PRV and safety valves from the boiler supplier?
They are sized from the same numbers as the boiler: pressure, peak flow and load profile. Buying them together means one set of calculations and one party accountable if the system does not perform.