Boiler house solutions, Singapore

Everything in the boiler house.One accountable partner.

Steam generation, distribution, safety, flow measurement and efficiency monitoring — sized, supplied, installed and supported by Techmatic Controls.

Industrial steam boiler installation
1989Established in Singapore
35+ yearsServing the process industry
ISO 9001:2015bizSAFE Level 4
In-houseSingapore Certified Energy Manager
One partner, the whole system

A boiler is only as good as the system around it

Steam that leaves the boiler still has to be reduced to the right pressure, protected against overpressure, measured and accounted for. We supply every item on this drawing, and we size them together — so the pieces work as a system rather than a parts list.

Boiler house diagram showing where each Techmatic item sits: CERTUSS steam boiler, Miyawaki pressure reducing valve, Goetze safety valves, Apollo gauge glass, ADCA automatic blowdown valve, Tekflow TekVorx, TekMass and TekMag meters, and the Boiler Efficiency Monitoring System
No.EquipmentBrandRole in the boiler house
1Steam boilerCERTUSSRaises steam at the required pressure, matched to the plant's load profile.
2Pressure reducing valveMiyawakiDelivers steam to each user at the pressure the process needs.
3Safety valvesGoetzeProtect the boiler and reduced-pressure mains against overpressure.
4Boiler gauge glassApolloDirect visual confirmation of boiler water level.
5Automatic blowdown valveADCARemoves dissolved solids and sludge from the boiler; operation logged by the monitoring system.
6FlowmetersTekflowTekVorx on steam, TekMag on water, TekMass on fuel gas.
7Efficiency monitoringBoiler Efficiency Monitoring SystemTurns the meter data into live efficiency, fuel cost and Scope 1 emissions.
1 · Steam generation — authorised CERTUSS distributor in Singapore

CERTUSS steam boilers: full steam in minutes, not hours

CERTUSS steam boilers reach full output within minutes of a cold start. For a plant that runs one shift, or in batches, that means no large water volume held hot overnight waiting for the next run — and none of the standing losses that go with it.

  • Fast start — full steam in roughly three to five minutes from cold, depending on range.
  • Compact, vertical construction — small footprint for the output; suitable for mezzanine installation.
  • Modulating burners on the Universal TC (50–100%) and UMX (20–100%) track the load instead of cycling.
  • Fired or electric — natural gas, LPG, light fuel oil, bio-fuel and dual fuel; or electric where there is no flue route.
  • Plant integration — touch-screen control with remote monitoring; Modbus, BACnet, Profibus and CAN bus on the Universal TC.
  • Scalable — multiple units can run together where demand exceeds a single unit.

Industrial steam boiler solutions · Browse CERTUSS models

CERTUSS UMX industrial steam generator, fired model
CERTUSS UMX — fired, modulating 20–100%
CERTUSS E6M–E72M electric steam generator with cabinet doors open
CERTUSS E6M–E72M — electric, where there is no flue route

Sizing and site survey

Steam boilers are not sold from a catalogue. The right size depends on your actual steam load — not the rating of the boiler being replaced.

To size the unit we need

  • Steam demand — peak, average and variation across shift or batch
  • Required steam pressure at point of use
  • Fuel available on site and operating pattern
  • Feedwater supply and whether condensate is returned

How we supply it

Boilers are supplied as turnkey projects — sizing, supply, installation, commissioning, in-service optimisation and MOM approvals — with servicing, upgrades and maintenance afterwards.

The site survey covers

  • Space, access route and floor or mezzanine loading
  • Flue route and termination
  • Fuel supply, gas train and electrical supply
  • Water treatment, feedwater and blowdown
  • Steam distribution to the point of use
2–5 · Distribution, safety and boiler fittings

Getting steam to the process — safely

These are the items that decide whether the steam a boiler makes actually reaches the process at the right pressure, dry, and without waste. We select them against the conditions on your line, not a catalogue default.

2Miyawaki pressure reducing valves

Most processes need steam well below boiler pressure. A correctly sized PRV holds downstream pressure steady as the load changes; an oversized one hunts and wears its seat.

  • Direct-acting and pilot-operated types
  • Sized on inlet pressure, set pressure and actual flow — not pipe size
  • Matching strainer, separator and downstream safety valve available
Miyawaki range

3Goetze safety valves

The last line of protection on the boiler and on every reduced-pressure main downstream of a PRV.

  • Boiler safety valves sized to relieve full boiler output at set pressure
  • Downstream safety valves sized for PRV failure-open flow
  • Set pressure, materials and test documentation specified for MOM registration and Authorised Examiner examination
Goetze range

4Apollo boiler gauge glasses

A direct, visual check of boiler water level that does not depend on electronics — the reference operators verify level controls against.

  • Reflex and transparent gauge types
  • Rated for boiler pressure and temperature
  • Complete with isolation and drain cocks for blowdown testing; replacement glasses and gaskets
Apollo range

5ADCA automatic blowdown valves

Blowdown keeps dissolved solids and sludge in the boiler within limits. Done by hand, it is either missed or overdone — and every overdone blowdown sends heated water to drain.

  • Rated for boiler pressure and temperature
  • Linked to the Boiler Efficiency Monitoring System, so each blowdown is logged and excess blowdown is flagged

Why buy the distribution items and boiler fittings from the boiler supplier

The PRV, its downstream safety valve and the boiler fittings are sized from the same numbers as the boiler: pressure, peak flow and load profile. Buying them together means one set of calculations and one party accountable if the system does not perform.

6 · Flow measurement — Tekflow flow instrumentation

You cannot manage what you do not meter

Boiler efficiency is fuel in against steam out. Without a meter on each, efficiency is an estimate made once a year. Three Tekflow meters cover the three streams that matter in a boiler house.

Steam

TekVorx vortex

Vortex-shedding principle with no moving parts — suited to saturated and superheated steam.

  • Boiler outlet main
  • Branch headers to each department or user
  • Specify with temperature / pressure compensation for mass flow
Water

TekMag electromagnetic

Full-bore, no pressure drop, no moving parts — for conductive liquids.

  • Make-up water to the feedwater tank
  • Cooling water and process water
  • Not for low-conductivity condensate or demineralised water — we will recommend an alternative
Gas

TekMass thermal mass

Measures gas mass flow directly, without separate pressure and temperature compensation.

  • Natural gas to the burner
  • Compressed air and other process gases
  • The fuel-in half of the efficiency calculation

What the meters tell you

Measurement pointMeterWhat it gives you
Fuel gas to burnerTekMassFuel consumption and cost; Scope 1 emissions from fuel flow
Steam leaving the boilerTekVorxSteam production; fuel-to-steam ratio and direct-method efficiency
Steam to each userTekVorxAllocation of steam cost by department, line or product
Make-up waterTekMagCondensate recovery rate — high make-up points to lost condensate or leaks

Sized and specified by Techmatic

A flowmeter chosen on line size alone often ends up running at the bottom of its range. We size each meter on the actual minimum, normal and maximum flow, and supply the certificates and configuration to match. Other Tekflow technologies — ultrasonic, turbine and variable-area — are available where the application calls for them. Tekflow range

7 · Monitoring — Techmatic BEMS

Boiler Efficiency Monitoring System

One integrated system — sensors, edge gateway and cloud dashboard — giving plant, finance and sustainability teams the same live view of combustion efficiency, fuel cost and Scope 1 emissions. Retrofits to any boiler brand, fire-tube or water-tube, gas, diesel or biomass.

What it measures

Fuel & steam flow
Fuel in, steam out, feedwater
Flue gas
Stack O₂, CO and temperature
Thermal profile
Feedwater temperature, deaerator pressure
Auxiliaries
Boiler feed pump kW
Blowdown
Blowdown valve operation and frequency

What it calculates

Efficiency
Thermal and combustion efficiency, continuously
EnPIs
Fuel-to-steam ratio, condensate recovery rate
Cost
Fuel cost per tonne of steam
Carbon
Scope 1 emissions from fuel flow

Alerts for burner drift, blowdown spikes and efficiency loss — before they show up on the fuel bill.

Open integration with existing BMS and SCADA.

Audit-ready data structured for ISO 50001-aligned energy management and energy audit reporting.

More on the Boiler Efficiency Monitoring System

CEM

An in-house Singapore Certified Energy Manager

We audit the boiler house, rank the savings and build the equipment case — supporting plants on the path to Singapore's net-zero by 2050.

Services around the equipment

Supply is the start, not the end

ServiceWhat it covers
Turnkey boiler projectsSizing, supply, installation, pipework, commissioning, in-service optimisation and MOM approvals
Boiler servicing and upgradesScheduled servicing, burner and control upgrades, economiser retrofits
Steam system analysisWhole-system review of generation, distribution and condensate return

A partner, not just a vendor

Engineering, not just supply

Every item is selected and sized against your actual line conditions.

35 years, second-generation owners

Serving Singapore's process industry since 1989.

In-house energy capability

Processes in line with recognised standards such as ISO 50001.

One accountable party

One set of calculations from boiler to steam header.

Common questions

How quickly does a CERTUSS steam boiler reach full steam?

Roughly three to five minutes from a cold start, depending on the range. That suits plants that run one shift or in batches, because no large volume of water has to be held hot overnight.

What information do you need to size a steam boiler?

Your steam demand (peak, average and variation across a shift or batch), the steam pressure required at point of use, the fuel available on site and your operating pattern, and your feedwater supply and whether condensate is returned. We confirm the rest during the site survey.

Do you handle MOM approvals?

Yes. Turnkey boiler projects include MOM approvals, and Goetze safety valves are supplied with the set pressure, materials and test documentation specified for MOM registration and Authorised Examiner examination.

Is there an option if our site has no flue route?

Yes. CERTUSS boilers are available as electric units, alongside natural gas, LPG, light fuel oil, bio-fuel and dual-fuel models.

Can the Boiler Efficiency Monitoring System be fitted to our existing boiler?

Yes. It retrofits to any boiler brand — fire-tube or water-tube, gas, diesel or biomass — and integrates with existing BMS and SCADA.

Why buy the PRV and safety valves from the boiler supplier?

They are sized from the same numbers as the boiler: pressure, peak flow and load profile. Buying them together means one set of calculations and one party accountable if the system does not perform.