Banyan CCP4 CCGT Project (Power Plant)
Project Name : Banyan CCP4 CCGT Project (Power Plant)
Location : Jurong Island, Singapore
Customer Name : Sembcorp Cogeneration Pte Ltd
Date Delivered : Sep 2025
Scope : Steam Traps
Each steam trap model was carefully selected based on pressure, temperature, condensate load, and specific process conditions. Our engineering team worked closely with the EPC contractor and the plant operator to verify sizing, ensure compatibility with existing systems, and optimize installation locations for maintenance accessibility.
Execution and Delivery
Despite tight project deadlines, Techmatic successfully coordinated manufacturing, inspection, and delivery within the client’s schedule.
Key achievements included:
- On-time delivery of more than 20 units of various steam traps
- 100% compliance with project technical specifications and QA/QC requirements
- Site support during commissioning
- training for maintenance personnel to ensure proper operation and long-term reliability
Our proactive coordination between engineering, logistics, and client teams ensured smooth integration with the plant’s construction schedule.
